Muzi Salama
2-bed size

Construction progress Desktop review

Ready for occupation
Complete 100%
Unit sales ongoing
100% complete
Construction finishedCompleted Jun 2026

Price from

KES 6.55M
2-bed, 60.9 m², KES 107,553 per m²

Total cost to buy

KES 6.88M
Monthly instalments, with stamp duty and legal fees

Available

On request
Ask the developer for live availability

Developer and team

Track record: IHS Kenya is the named developer. Tilisi identifies Muzi Salama as part of its residential community; developer delivery history and phase handover should be verified independently. Desktop review

DeveloperIHS Kenya
Official project website, 13 Oct 2026
Master developerTilisi Developments PLC
Provides the wider master-planned environment.
Tilisi website, 13 Oct 2026
Sales / enquiriesMuzi Salama / IHS Kenya Sales Team
Official project sales channel; verify current Phase 1 availability.
Official project website, 13 Oct 2026

Amenities

  • Clubhouse
  • gym area
  • children's play areas
  • landscaped green spaces
  • rooftop terraces
  • 25 m heated pool
  • biometric access
  • CCTV
  • backup generator for common areas
  • resident and visitor parking
  • EDGE-oriented resource efficiency

What it costs and how to pay

Starting price as of 13 Oct 2026 Desktop review. Prices can vary by floor, view and position, so confirm the exact unit price with the developer. Current official starting price. Payment terms Desktop review, 13 Oct 2026.

Total cost to buy

Purchase price, fromAsking price, paid over the instalment plan
KES 6.55M
Total cost to buy
KES 6.88M
Then every monthService charge
On request

Cash payment

Cash2-bed, 60.9 m²
KES 6.55M
DiscountNo cash discount stated; ask the developer
—
Total cost to buyWith stamp duty and legal fees
KES 6.88M

Instalment plan

Instalment plan2-bed, 60.9 m²
KES 6.55M
Deposit20% on signing
KES 1.31M
Monthly instalments80% over 24 months
KES 218,333
Total cost to buyWith stamp duty and legal fees
KES 6.88M

Stamp duty is 4% here (4% within municipalities, 2% elsewhere), charged on the government valuation, which can be higher than the price. Service charge deposit, sinking fund, utility deposits and registration are usually paid later, at handover. Mortgage terms vary by bank, so get them directly from your bank.

Our view

Adidon verdict
Clear prices and honest sizes. Check Phase 1's status first.
Adidon

Muzi Salama is in Tilisi, near the Nairobi–Nakuru highway. The developer publishes clear prices and floor areas: KES 6.55M for a 60.9 m² two-bedroom and KES 8.6M for an 83.4 m² three-bedroom, about KES 103,000 to KES 108,000 per m².

Facilities include a clubhouse, gym, 25 m heated pool, play areas, rooftop terraces, landscaped gardens, biometric access and CCTV. The developer offers cash, mortgage and a 24-month monthly plan with a 20% deposit.

Handover of Phase 1 has been reported, but I couldn't confirm it independently, so that's the first thing I'd check.

Before you pay17 checks to run before you commit any money: approvals, title, quality, progress, payment protection and the full cost. Includes 6 specific to Muzi Salama.

New to buying property? Start with the title, the approvals and the sale agreement. These protect your money most. Get an advocate to review the documents before you sign or pay a deposit.

  • Verify the approvals. Ask to see the relevant development and construction approvals, ownership or title documents, and any required permits. Have an independent advocate review them.
  • Review the consultants' reports. Request relevant reports and certifications from the project's architect, engineer and other appointed professionals.
  • Ask for quality-control evidence. Request approved material specifications and test results for items such as concrete, steel and soil, where applicable. Confirm these with the project engineer.
  • Get progress confirmed independently. Ask for a dated progress report signed by the appointed consultants. If the project is behind schedule, request a written recovery or mitigation plan.
  • Clarify the completion date and remedies. Ensure the sale agreement states the completion date and explains what happens if delivery is delayed, including any agreed late-delivery compensation.
  • Ask about contractor security. Confirm whether the contractor has provided a performance bond and whether it remains valid for the relevant works.
  • Understand the full purchase cost. Request a written breakdown of the price, taxes, legal and transaction costs, utility or connection charges, service charge, and any other fees.
  • Check the payment plan. Confirm when each instalment is due, what it is tied to, and how payments are protected if construction is delayed or the project changes.
  • Inspect a completed unit or show house. Compare the finishes and fittings with the written specifications, and ask how changes or defects will be handled.
  • Confirm what is included. Check the unit size, parking, amenities, finishes, fixtures and any shared facilities against the sale documents.
  • Get independent advice before signing. Have an advocate review the sale agreement and consider asking an independent building professional to assess the project.

Also check for Muzi Salama

  • Inspect the exact Phase 1 unit.
  • Confirm occupation certificate and sectional title.
  • Obtain current service charge and sinking-fund budget.
  • Verify parking allocation and transfer costs.
  • Request the official payment schedule and completion status.
  • Compare achieved rents with the KSh 6.55M entry price.

Risks and caveats

This is our opinion, based on our extensive research and the information available at the time of review. It is not financial or legal advice.

Sources

6 sources behind this review, each with its date and how reliable it is. Open to see them and follow the links.
Desktop review
Desktop review
Desktop review
Desktop review

Found an error? Email info@propertyinsights.africa and we'll correct it within 5 working days.

More on this project

Property Insights Africa

Contact us

Property Insights AfricaPowered by Adidon LimitedPO Box 84640-80100, Mombasa