Property Insights AfricaPowered by Adidon Limited
Nairobi / Westlands / Brookside

Kenzi Residence

A completed 112-unit Saif Real Estate development on School Lane in Westlands, offering studios plus one- and two-bedroom apartments with contemporary layouts and shared wellness and leisure amenities.
Updated 14 Oct 2026Desktop reviewEditorial
Kenzi Residence
Studio size

Construction progress Desktop review

Ready for occupation
Complete 100%
Unit sales ongoing
100% complete
Construction finishedCompleted Apr 2026

Price from

KES 5.30M
Studio, 35 m², KES 151,429 per m²

Total cost to buy

KES 5.57M
Cash, with stamp duty and legal fees

Available

On request
Ask the developer for live availability

Developer and team

Track record: Saif Real Estate markets multiple completed and active developments in Nairobi. Kenzi was officially handed over in September 2026 after construction began in October 2021. Desktop review

DeveloperSaif Real Estate
Official project website, 14 Oct 2026
Main contractorNels Enterprises Ltd
Named contractor in Saif progress reporting.
Developer report, 1 Mar 2024
ArchitectDesign N Development Consultants
Published architectural project record for Kenzi on School Lane.
Other, 14 Oct 2026
Sales / enquiriesSaif Real Estate Sales Team
info@saifproperties.com; +254 728 000 002.
Official project website, 14 Oct 2026

Amenities

  • Heated swimming pool
  • gym
  • spa and sauna
  • yoga area
  • rooftop garden lounge
  • social house
  • high-speed lifts
  • borehole
  • backup generator
  • CCTV and access control
  • electric fence
  • landscaped gardens
  • parking

What it costs and how to pay

Starting price as of 14 Oct 2026 Desktop review. Prices can vary by floor, view and position, so confirm the exact unit price with the developer. Ready unit; attributable verified listing. Saif currently advertises remaining stock from KSh 7M. Payment terms Desktop review, 14 Oct 2026.

Total cost to buy

Cash price, fromAsking price; no cash discount stated
KES 5.30M
Total cost to buy
KES 5.57M
Then every monthService charge
On request

Cash payment

CashStudio, 35 m²
KES 5.30M
DiscountNo cash discount stated; ask the developer
—
Total cost to buyWith stamp duty and legal fees
KES 5.57M

Instalment plan

Instalment planAsk the developer for current instalment terms
—

Stamp duty is 4% here (4% within municipalities, 2% elsewhere), charged on the government valuation, which can be higher than the price. Service charge deposit, sinking fund, utility deposits and registration are usually paid later, at handover. Mortgage terms vary by bank, so get them directly from your bank.

Our view

Adidon verdict
Finished and ready in Westlands. Inspect the unit and get a dated quote.
Adidon

Kenzi Residence is a completed 112-unit tower on School Lane in Westlands, built by Saif Real Estate. It was handed over in September 2026, five months after the April 2026 date first given.

The prices I found are KES 5.3M for a 35 m² studio, KES 9.5M for a 61 m² one-bedroom and KES 15M for a 94 m² two-bedroom, about KES 151,000 to KES 160,000 per m². Saif advertises its remaining units from KES 7M, so prices differ between sources.

Residents get a heated pool, gym, spa, sauna, yoga area, rooftop lounge and backup services, and the tower is close to Westlands offices, shops and restaurants.

Before you pay17 checks to run before you commit any money: approvals, title, quality, progress, payment protection and the full cost. Includes 6 specific to Kenzi Residence.

New to buying property? Start with the title, the approvals and the sale agreement. These protect your money most. Get an advocate to review the documents before you sign or pay a deposit.

  • Verify the approvals. Ask to see the relevant development and construction approvals, ownership or title documents, and any required permits. Have an independent advocate review them.
  • Review the consultants' reports. Request relevant reports and certifications from the project's architect, engineer and other appointed professionals.
  • Ask for quality-control evidence. Request approved material specifications and test results for items such as concrete, steel and soil, where applicable. Confirm these with the project engineer.
  • Get progress confirmed independently. Ask for a dated progress report signed by the appointed consultants. If the project is behind schedule, request a written recovery or mitigation plan.
  • Clarify the completion date and remedies. Ensure the sale agreement states the completion date and explains what happens if delivery is delayed, including any agreed late-delivery compensation.
  • Ask about contractor security. Confirm whether the contractor has provided a performance bond and whether it remains valid for the relevant works.
  • Understand the full purchase cost. Request a written breakdown of the price, taxes, legal and transaction costs, utility or connection charges, service charge, and any other fees.
  • Check the payment plan. Confirm when each instalment is due, what it is tied to, and how payments are protected if construction is delayed or the project changes.
  • Inspect a completed unit or show house. Compare the finishes and fittings with the written specifications, and ask how changes or defects will be handled.
  • Confirm what is included. Check the unit size, parking, amenities, finishes, fixtures and any shared facilities against the sale documents.
  • Get independent advice before signing. Have an advocate review the sale agreement and consider asking an independent building professional to assess the project.

Also check for Kenzi Residence

  • Inspect the exact apartment, finishes, appliances and common areas.
  • Obtain the current Saif price and availability schedule.
  • Confirm title, sectional plan, occupation certificate and seller entity.
  • Verify parking allocation, service charge, sinking fund and arrears.
  • Review defects liability and outstanding snag items.
  • Check letting and short-stay rules before estimating rental returns.

Risks and caveats

This is our opinion, based on our extensive research and the information available at the time of review. It is not financial or legal advice.

Sources

6 sources behind this review, each with its date and how reliable it is. Open to see them and follow the links.

Found an error? Email info@propertyinsights.africa and we'll correct it within 5 working days.

More on this project

Property Insights Africa

Contact us

Property Insights AfricaPowered by Adidon LimitedPO Box 84640-80100, Mombasa